2001 – Mobile Link Bridge for Singapore Cruise Centre

In 2001 we were awarded a contract by PSA to design and build a mobile gangway similar to the aerobridges used at the airport terminals. The requirement of this gangway is that it must be able to dock to any type of cruise ships that call at their port from their seven (7) metre high elevated cruise terminal to any ship up to 12 m high.

  • 1996

Contact Syntech

We will contact you soon!