2004 – Mechanical ramp for PSA and 2 more for Jurong Port in 2007
In 2004, We designed and built a mechanical ramp for port operations. This ramp is to be used for barges carrying containers from neighbouring islands. The ramp is designed for carrying truck and trailer load of up to 65 ton and is built in accordance to BS5400 and BS6349 standards)