Pier Service Tower

In early 1994, Sembawang Shipyard in Singapore commissioned us to manufacture and install 10 units of pier service towers.

The purpose of these service towers is to supply water, air, gas, electricity, hydraulic oil and lubricating oil to ships that call at their yard for repairs.  The service tower is 28 metre tall with a 12 metre long hydraulic powered boom.

The service towers were first built in our factory, transported to the shipyard by trucks, and then transported to the site by a barge crane.  Precision manufacturing and mounting is required to ensure that the tower is perpendicular to the pier when erected.